TEAK DECING

How Your New Teak Deck is Installed

Removal of the old deck, vacuum bonding and installation: 

This is how we install your new teak deck 


1

Removal of the old teak deck

If it is not a first time teak deck installment, the old deck  should be removed before fitting a new teak deck. Once the deck removal is complete, all screw holes are sealed and the deck is prepared for vacuum bonding. Teak deck removal is a position that can also be performed by the owners themselves - We are happy to provide advice and assistance in this case.

Removal of the old teak deck

2

Preparation of the boat deck

Once the old teak deck has been removed, the boat deck is examined and prepared for a new teak deck. For GRP boats, we pay great attention to a watertight deck, a dry sandwich core and an undamaged gelcoat. On yachts made of steel, the corrosion protection is checked or renewed and plywood decks are sealed. If the boat deck is in a technically sound condition, the deck is chemically cleaned and prepared for vacuum bonding with a primer.

Moisture measurement on a Farr 60. The yacht deck must be prepared before the installation of the new teak deck by Mobilerbootsbau teak decking company

3

Vacuum bonding

Hardly any other development has shaped modern boatbuilding as much as the vacuum bonding process. Here, the component to be bonded is sealed against the ambient air with a vacuum film and special vacuum pumps evacuate the remaining air under the film. As a result, the atmosphere presses the two components together with up to 10 tonnes per square metre. By using this technology, our decks fit exactly and the bonds are bubble-free.

The new teak deck or boat deck made of wood alternatives is joined to the hull by vacuum bonding

4

Completion

After the teak deck has been glued to the surface, the joints are drawn and the deck hardware is fitted and screwed in place. The renewal of a teak deck is a good opportunity to also change the deck layout or modernise parts of the deck hardware . We are experienced sailors and will be happy to advise you. We also work with the leading manufacturers of deck hardware and can offer you a wide portfolio of products.

The deck hardware is fitted and screwed in place during a teak decking process by boat building company Mobilerboots

Short yard times

Waterproof decks

Corrosion protection

Watertight sandwich decks

Footstep sound insulation

No screws or plugs

High-quality wood and materials

Europe-wide

You want to have work done on your yacht? Contact us and we will be happy to help you.

CONTACT

Find the perfect teak deck for your yacht

Plywood

Our solutions for teak decks on plywood

Learn more

Aluminium

Our teak deck solutions for aluminium yachts

Learn more

Steel

Our teak deck solutions for steel yachts



Learn more

GRP

Our teak deck solutions for GRP yachts



Learn more

Learn more about our teak decking process

Share by: